We participated in:

Construction of over 100 substations and switchyards SS 400/x kV, SS 220/x kV, SS 110/x kV

Reconstruction and/or expansion of over 100 substations and switchyards, voltage levels 110, 220 and 400 kV

Preparations for the transition/migration to remote control (RC) 65 SS 110/x kV

Preparations for the transition/migration to remote control (TRC) 18 SS 400(220)/x kV

Installation of 5 Regional Dispatch Centers

Construction, reconstruction, adaptation and repair of damaged transmission lines with voltage levels up to 400 kV

Connection of electricity producers and consumers to the Serbian transmission system

We have special experience and references in eliminating the consequences and repairing entire or parts of substations, switchyards and transmission lines after accidents.

Many years of work have earned very respectable references

reference selection

The selection of references we list, shows the diversity and complexity of our work as well as the types of most significant projects we have executed

Substations

Object

Job description

SS 400/220/110 kV Pančevo 2

Complete reconstruction of the substation

SS 400/110 kV Bor 2

Complete reconstruction of the substation

SS 400/220/110 kV Smederevo 3

Complete reconstruction of the substation

SS 400/220/110 kV Srbobran

Complete reconstruction of the substation

SS 400/220 kV Obrenovac

Complete reconstruction of the substation

SS 400/220 kV Beograd 8

Complete reconstruction of the substation

SS 400/220/110 kV Leskovac 2

Complete reconstruction of the substation

SS 400/220/110 kV Niš 2

Complete reconstruction of the substation

SS 220/110/35 kV Beograd 5

Complete reconstruction of the substation

SS 220/110 kV Beograd 3

Complete reconstruction of the substation

Substation 220/110/35 kV Kruševac 1

Complete reconstruction of the substation

SS 220/35 kV Bajina Bašta

Complete reconstruction of the substation

SS 110/10 kV Majdanpek 1

Complete reconstruction of the substation

SS 400/110 kV Vranje 4

Construction of a new substation

SS 400/110 kV Beograd 20

Construction of a new substation

SS 110/35 kV Vranje 2

Construction of a new substation

SS 110/35 kV Mosna

Construction of a new substation

SS and PRP 110/10 kV Veliki Krivelj

Construction of a new substation

Wind power plant Alibunar

Construction CDS 110 kV and OHL

TPP TEKO B3 – DS Drmno

Field construction 400 kV and 110 kV

Power transformers

Object

Job description

SS 400/220/110 kV Smederevo 3

Installation of a new power transformer 300 MVA

SS 400/220/110 kV Srbobran

Installation of a new power transformer 300 MVA

SS 400/110 kV Subotica 3

Installation of a new power transformer 300 MVA

SS 400/110 kV Bor 2

Installation of a new power transformer 300 MVA

TPP ,,TENT B” Obrenovac

Installation of a new block transformer 725 MVA

SS 400/110 kV Podgorica 2

Installation of a new power transformers 300 MVA

SS 400/110 kV Lastva

Installation of a new power transformers 300 MVA

Wind power plant Čibuk 1

Installation of a two new power transformers 90 MVA

SS 110/10 kV Majdanpek 1

Installation of a two new power transformers 31,5 MVA

SS 110/10 kV Veliki Krivelj 2

Installation of a three new power transformers 31,5 MVA

SS 110/6 kV LAFARGE Beočin

Revision and overhaul of power transformer 31,5 MVA

SS 400/220/110 kV Pančevo 2

Complete reconstruction of substations

ТPP Gacko

Chemical regeneration of transformer oil in the transformer, general overhaul of the main excitation transformer

Transmission lines

Object

Job description

OHL 2x110 kV SS Beograd 3 – SS Beograd 20

Lead in SS Beograd 20, Construction and reconstruction of transmission lines

OHL 2x2x110 kV SS Beograd 1 – SS Beograd 20

Construction of the left and right transmission line

OHL 2x2x110 kV SS Kragujevac 1 – SS Kragujevac 8

Construction and reconstruction of FAS (Fiat Automobiles Serbia) transmission lines

OHL 220 kV No. 253/2 SS HIP 2 – SS Pančevo 2​

Lead in SS 220/6/6 kV NIS transmission line construction

OHL 110 kV SS Valjevo – SS Zvornik

Sections B, G and H, construction of transmission lines

OHL 400 kV SS Novi Sad 3 – SS Subotica 3

Lead in SS Srbobran, construction of transmission lines

OHL 110 kV SS Smederevo 3 – SS Kostolac А

Lead in SS Požarevac, construction of transmission lines

OHL 110 SS Ada – SS Kikinda, construction of transmission lines

Construction of
transmission lines

OHL 110 SS Srbobran – SS Bečej, reconstruction of transmission lines

Reconstruction of transmission lines